Economics Overview
Jasper turns a converged flowsheet into a provenance-tracked CAPEX + OPEX estimate. Every number in the result traces back to a cited source with a basis date — the engine never invents a cost.
The pipeline
Converged flowsheet
▼
Equipment sizing (area, power, volume per unit — see Equipment Sizing)
▼
Cost database lookup (correlation + material factor, by unit type)
▼
Purchased cost (at the correlation's base year)
▼
Bare-module cost (installation factors)
▼
Escalation (Jasper Cost Index, monthly 2001 → today)
▼
Location factor (US-GC base · US-MW · EU)
▼
Contingency (by AACE class)
▼
CAPEX + OPEX (feeds, utilities) − revenue (products)
Each step's math is documented in Costing Methods; the data layer behind it in The Cost Database.
Accuracy: AACE Class 4–5
Every result is stamped AACE Class 4-5 (+/-30-40%). This is a feasibility / study-grade estimate built from published correlations (Turton, Seider et al.) — not vendor quotes. The class is honest: where two independent sources cost the same equipment, they agree within a few percent for some classes (heat exchangers, 3.3%) and disagree by up to ~67% for others (compressors), which is exactly the band Class 4–5 declares.
Honesty principles
- Provenance on every value. Each cost carries the source of its correlation, material factor, escalation index, and contingency. Sources are listed in Data Sources & Licensing.
- Gaps, not guesses. Anything that can't be costed (missing correlation, unpriced chemical) becomes a gap row — visible, excluded from totals, never silently filled.
- Representative prices are flagged. Chemical prices are literature values until you override them; the estimate says so whenever they're used.
- Margins are computed, not promised. Revenue − feeds − utilities can be negative; the engine reports what the numbers say.
Using it in the editor
Economics is a Pro feature. With a converged run:
- Console → Economics tab — project totals: CAPEX, feeds/yr, utilities/yr, revenue/yr, margin/yr, with per-item tables, source citations, and any gaps. Region (US-GC / US-MW / EU) and AACE class (5 / 4) are selectable.
- Node sidebar → Cost section — per-unit module cost with provenance; per-feed and per-product annual flows and prices.
- Sink roles — each Sink declares whether its stream is a
product(counts as revenue),waste, orignore. Defaults to product.
Operating hours for annualization come from the project's economic settings (default 8000 h/yr).
Prices you can override
Chemical and utility prices resolve through an append-only override system with scope precedence (scenario → project → global → default), so you can pin contract prices without losing the audit trail. See Prices & Overrides.